Fruta del Norte – Zamora Chinchipe, 2015

MINING
DIVISION

We build, extract, and operate —
mining responsibly and sustainably.

We deliver specialized engineering and construction solutions for the mining industry, covering every stage: from conceptual design and development to implementation, operation, and maintenance.

Managing Company:

Sevilla y Martínez
Ingenieros C.A. SEMAICA

Contact us

Daniel Falconí
PROJECT MANAGER

+593 2 3955600 ext.: 700

CORE SERVICES

  • Tunnel design and construction.
  • Early works for mine development.
  • Mineral processing plant construction.
  • Tailings dam construction and monitoring.
  • Transmission lines and substations.
  • Water treatment plants.
  • Access roads and on-site camps.
  • Full mining operation and exploitation services.
  • Zero-accident policy backed by rigorous safety standards.
  • Cost efficiency and operational productivity.
  • Deployment of modern, reliable equipment.
Slide
01. ENGINEERING AND CONSTRUCTION OF INFRASTRUCTURE FOR OPEN-PIT AND UNDERGROUND MINING

· Tunnel design and construction.
· Early works for mine development.
· Mineral processing plant construction.
· Tailings dam construction and monitoring.
· Transmission lines and substations.
· Water treatment plants.
· Access roads and on-site camps.
· Full mining operation and exploitation services.

Slide
02. COMMITMENT TO SAFETY

· Zero-accident policy backed by rigorous safety standards.
· Cost efficiency and operational productivity.
· Deployment of modern, reliable equipment.

FEATURED PROJECTS

Sopladora Hydroelectric Plant – Azuay, 2019

Location: Azuay Province, part of the Paute hydroelectric complex.
Executed works: Construction of two strategic tunnels.

Túnel de Carga – Proyecto Hidroeléctrico DUE – Sucumbíos, 2019

Tunnel length: 2,832 m; pressure pipeline: 1,600 m (4.5 m diameter steel pipe for high hydraulic loads).

DUE Hydroelectric Project – Sucumbíos, 2019

Tunnel length: 2,832 m; pressure pipeline: 1,600 m (4.5 m diameter steel pipe for high hydraulic loads).

Fruta del Norte – Zamora Chinchipe, 2015

Two twin adits excavated in white soil, each with 4,000 m tunnels and -15% slope. Total excavation: 9,278 m³ under complex geological conditions.

Pachicutza Gold Mine – Zamora Chinchipe, 2015

Main tunnel: 725 m (14 m² section); exploration galleries: 350 m; total excavation 9,278 m³.

Pachicutza Gold Mine – Zamora Chinchipe, 2015

Main tunnel: 725 m (14 m² section); exploration galleries: 350 m; total excavation 9,278 m³.